“(Atomic Energy of Canada Limited recommends) that the Chalk River 5 million volt (MV) tandem accelerator be replaced by…a tandem accelerator of advanced design, capable of operating with 10 MV on the terminal. “This will provide precisely‐controlled heavy‐ion beams of much greater energy and intensity than the present accelerator, e.g., bromine ions of 160 MeV, more energetic than the fastest fission fragments. The High Voltage Engineering Corporation (HVEC) has carried out the basic design and is prepared to build such a machine, the MP II Tandem, and to guarantee reliable operation at 10 MV…”
This content is only available via PDF.
© 1964 American Institute of Physics.
1964
American Institute of Physics
You do not currently have access to this content.