The construction program of AURORA, the compact synchrotron light source, was started in the fall of 1986, and is now at the final assembly stage. We have observed a good uniform field from the superconducting magnet. In this article the construction status of the superconducting electron storage ring, injection microtron, beam monitoring, and control system is briefly reported.

1.
N.
Takahasi
,
Nucl. Instrum. Methods Phys. Res. B
24/25
,
425
(
1987
);
N.
Takahasi
et al.,
Proc. SPIE
923
,
47
(
1988
).
2.
T.
Takayama
,
Nucl. Instrum. Methods Phys. Res. B
24/25
,
420
(
1987
);
these proceedings.
3.
Y. Toba, in Proceedings for the Workshop on the HiSOR Project, Feb. 24, 1987, Hiroshima (distributed in Japanese).
4.
N. Yasumitu et al., Proceedings of Vacuum Design of Advanced and Compact Synchrotron Light Source, Brookhaven, May 1988 (to be published).
5.
M. Sugitani et al., Proceeding of the 1st European Particle Accelerator Conference, Rome, June 1988;
Proceedings of the 6th Symposium on Accelerator Science and Technology, Tokyo, October 1987.
6.
H. Yamada et al., to be published.
7.
H. Yamada et al., these proceedings.
This content is only available via PDF.
You do not currently have access to this content.