Marine renewable energy (MRE), which includes wave, tidal, and offshore wind energy, has the potential to make significant contributions towards a sustainable energy future in a number of countries worldwide. One such country is Spain, where MREs are among the largest renewable resources; yet they are not playing their full part in the national energy mix. Among other constraints, the lack of a specific policy framework promoting this emerging sector is often pointed to as the main barrier for MRE grid penetration. This paper assesses the Spanish MRE sector, in terms of resource availability, government plans, policy regulations, and projects undertaken, with a view to establish a comparison with the situation in other European countries. In particular, the United Kingdom is used as a case study to analyze ongoing research activities, pilot projects, and lessons learned. As a result, it is found that public funding needs to be increased; the economic crisis should be seen as an opportunity for job creation and industrial development rather than a barrier; administrative procedures must be simplified and cross-national cooperation should be increased. Policies focused on these aspects may contribute to boost the MRE sector in Spain.

1.
Ahmadian
,
R.
and
Falconer
,
R. A.
, “
Assessment of array shape of tidal stream turbines on hydro-environmental impacts and power output
,”
Renewable Energy
44
,
318
327
(
2012
).
2.
Astariz
,
S.
and
Iglesias
,
G.
, “
The economics of wave energy: A review
,”
Renewable Sustainable Energy Rev.
45
,
397
408
(
2015
).
3.
Astariz
,
S.
,
Abanades
,
J.
,
Perez-Collazo
,
C.
, and
Iglesias
,
G.
, “
Improving wind farm accessibility for operation & maintenance through a co-located wave farm: Influence of layout and wave climate
,”
Energy Convers. Manage.
95
,
229
241
(
2015a
).
4.
Astariz
,
S.
,
Perez-Collazo
,
C.
,
Abanades
,
J.
, and
Iglesias
,
G.
, “
Co-located wind-wave farm synergies (operation & maintenance): A case study
,”
Energy Convers. Manage.
91
,
63
75
(
2015b
).
5.
Astariz
,
S.
,
Perez-Collazo
,
C.
,
Abanades
,
J.
, and
Iglesias
,
G.
, “
Towards the optimal design of a co-located wind-wave farm
,”
Energy
84
,
15
24
(
2015c
).
6.
Astariz
S.
,
Perez-Collazo
C.
,
Abanades
J.
, and
Iglesias
G.
, “
Co-located wind-wave farms: economic assessment as a function of layout
,”
Renewable Energy
83
,
837
849
(
2015d
).
43.
Atlantis Resources Ltd.
, See http://www.atlantisresourcesltd.com/ for information about global development of tidal power generation, 2015.
7.
Azzellino
,
A.
,
Conley
,
D.
,
Vicinanza
,
D.
, and
Kofoed
,
J. P.
, “
Marine renewable energies: perspectives and implications for marine ecosystems
,”
Sci. World J.
2013
,
547563
(
2013a
).
8.
Azzellino
,
A.
,
Ferrante
,
V.
,
Kofoed
,
J. P.
,
Lanfredi
,
C.
, and
Vicinanza
,
D.
, “
Optimal siting of offshore wind-power combined with wave energy through a marine spatial planning approach
,”
Int. J. Mar. Energy
3–4
,
11
25
(
2013b
).
9.
Azzellino
,
A.
,
Kofoed
,
J. P.
,
Lanfredi
,
C.
,
Margheritini
,
L.
, and
Pedersen
M.
, “
A marine spatial planning framework for the optimal siting of marine renewable energy installations: two Danish case studies
,”
J. Coastal Res., Spec. Issue
65
,
1623
1628
(
2013c
).
10.
Bailey
,
I.
,
de Groot
,
J.
,
Whitehead
,
I.
,
Vantoch-Wood
,
A.
, and
Connor
,
P.
, “
Comparison of national policy frameworks for marine renewable energy within the United Kingdom and France
,” Task 4.1.2 of WP4 from the MERiFIC Project, University of Plymouth,
2012
.
11.
Bilgili
,
M.
,
Yasar
,
A.
, and
Simsek
,
E.
, “
Offshore wind power development in Europe and its comparison with onshore counterpart
,”
Renewable Sustainable Energy Rev.
15
(
2
),
905
915
(
2011
).
12.
BIMEP
, see http://www.fp7-marinet.eu/EVE-biscay-marine-energy-platform-bimep.html for EVE Biscay Marine Energy Platform.
13.
Buccino
,
M.
,
Banfi
,
D.
,
Vicinanza
D.
,
Calabrese
M.
,
del Giudice
G.
, and
Carravetta
A.
, “
Non breaking wave forces at the front face of Seawave Slotcone generators
,”
Energies
5
(
11
),
4779
4803
(
2012
).
14.
Carballo
,
R.
,
Iglesias
,
G.
, and
Castro
,
A.
, “
Numerical model evaluation of tidal stream energy resources in the Ría de Muros (NW Spain)
,”
Renewable Energy
34
,
1517
1524
(
2009
).
15.
Carballo
,
R.
and
Iglesias
,
G.
, “
A methodology to determine the power performance of wave energy converters at a particular coastal location
,”
Energy Convers. Manage.
61
,
8
18
(
2012
).
16.
Carballo
,
R.
,
Sánchez
,
M.
,
Ramos
,
V.
,
Fraguela
,
J. A.
, and
Iglesias
,
G.
, “
Intra-annual wave resource characterization for energy exploitation: A new decision-aid tool
,”
Energy Convers. Manage.
93
,
1
8
(
2015
).
17.
Carballo
,
R.
,
Sánchez
,
M.
,
Ramos
,
V.
,
Taveira-Pinto
,
F.
, and
Iglesias
,
G.
, “
A high resolution geospatial database for wave energy exploitation
,”
Energy
68
,
572
583
(
2014
).
18.
Denny
,
E.
, “
The economics of tidal energy
,”
Energy Policy
37
,
1914
1924
(
2009
).
19.
Ellabban
,
O.
,
Abu-Rub
,
H.
, and
Blaabjerg
,
F.
, “
Renewable energy resources: Current status, future prospects and their enabling technology
,”
Renewable Sustainable Energy Rev.
39
,
748
764
(
2014
).
20.
EMEC
, see http://www.emec.org.uk/ for information about international marine renewable energy projects,
2015
.
21.
Esteban
,
M. D.
,
Diez
,
J. J.
,
López
,
J. S.
, and
Negro
,
V.
, “
Why offshore wind energy?
,”
Renewable Energy
36
(
2
),
444
450
(
2011
).
22.
Evans
,
P.
,
Mason-Jones
,
A.
,
Wilson
,
C.
,
Wooldridge
,
C.
,
O'Doherty
,
T.
, and
O'Doherty
,
D.
, “
Constraints on extractable power from energetic tidal straits
,”
Renewable Energy
81
,
707
722
(
2015
).
23.
Fairley
,
I.
,
Evans
,
P.
,
Wooldridge
,
C.
,
Willis
,
M.
, and
Masters
,
I.
, “
Evaluation of tidal stream resource in a potential array area via direct measurements
,”
Renewable Energy
57
,
70
78
(
2013
).
24.
Foxon
,
T. J.
,
Gross
,
R.
,
Chase
,
A.
,
Howes
,
J.
,
Arnall
,
A.
, and
Anderson
,
D.
, “
UK innovation systems for new and renewable energy technologies: drivers, barriers and systems failures
,”
Energy Policy
33
,
2123
2137
(
2005
).
25.
Frid
,
C.
,
Andonegi
,
E.
,
Depestele
,
J.
,
Judd
,
A.
,
Rihan
,
D.
,
Rogers
,
S. I.
, et al., “
The environmental interactions of tidal and wave energy generation devices
,”
Environ. Impact Assess. Rev.
32
,
133
139
(
2012
).
26.
Ghezloun
,
A.
,
Saidane
,
A.
, and
Oucher
,
N.
, “
Energy policy in the context of sustainable development: Case of Morocco and Algeria
,”
Energy Procedia
50
,
536
543
(
2014
).
27.
Goldemberg
,
J.
,
Coelho
,
S. T.
, and
Lucon
,
O.
, “
How adequate policies can push renewables
,”
Energy Policy
32
,
1141
1146
(
2014
).
28.
Hooper
,
T.
and
Austen
,
M.
, “
Tidal barrages in the UK: Ecological and social impacts, potential mitigation, and tools to support barrage planning
,”
Renewable Sustainable Energy Rev.
23
,
289
298
(
2013
).
29.
IDAE
, see http://www.idae.es/index.php/mod.documentos/mem.descarga?file=/documentos_11227_PER_2011-2020_def_93c624ab.pdf [09/16/2013] for “Renewable Energy Plan 2010-2020,” Instituto para la Diversificación y Ahorro de Energía (IDAE),
2011
.
30.
Iglesias
,
G.
and
Carballo
,
R.
, “
Wave energy potential along the Death Coast (Spain)
,”
Energy
34
,
1963
1975
(
2009
).
31.
Iglesias
,
G.
,
López
,
M.
,
Carballo
,
R.
,
Castro
,
A.
,
Fraguela
,
J. A.
, and
Frigaard
,
P.
, “
Wave energy potential in Galicia (NW Spain)
,”
Renewable Energy
34
,
2323
2333
(
2009
).
32.
Iglesias
,
G.
and
Carballo
,
R.
, “
Offshore and inshore wave energy assessment: Asturias (N Spain)
,”
Energy
35
,
1964
1972
(
2010a
).
33.
Iglesias
,
G.
and
Carballo
,
R.
, “
Wave energy resource in the Estaca de Bares area (Spain)
,”
Renewable Energy
35
,
1574
1584
(
2010b
).
34.
Iglesias
,
G.
,
Sanchez
,
M.
,
Carballo
,
R.
, and
Fernandez
,
H.
, “
The TSE index—A new tool for selecting tidal stream sites in depth-limited regions
,”
Renewable Energy
48
,
350
357
(
2012
).
35.
Jeffrey
,
H.
,
Sedgwick
,
J.
, and
Gerrard
,
G.
, “
Public funding for ocean energy: A comparison of the UK and U.S
,”
Technol. Forecasting Soc. Change
84
,
155
170
(
2014
).
36.
Law of Coasts 22/1988
, see http://www.boe.es/buscar/doc.php?id=BOE-A-1988-18762 for information about wind power solutions for offshore, onshore and service projects,
1998
.
37.
Lee
,
J. H.
,
Park
,
S.
,
Kim
,
D. H.
,
Rhee
,
S. H.
, and
Kim
,
M.
, “
Computational methods for performance analysis of horizontal axis tidal stream turbines
,”
Appl. Energy
98
,
512
523
(
2012
).
38.
Leete
,
S.
,
Xu
,
J.
, and
Wheeler
,
D.
, “
Investment barriers and incentives for marine renewable energy in the UK: An analysis of investor preferences
,”
Energy Policy
60
,
866
875
(
2013
).
39.
Li
,
Y.
and
Çalişal
,
S. M.
, “
Numerical analysis of the characteristics of vertical axis tidal current turbines
,”
Renewable Energy
35
,
435
442
(
2010
).
40.
Siemens Ltd.
, see http://www.energy.siemens.com/hq/en/renewable-energy/wind-power/offshore.htm/ for information about wind power solutions for offshore, onshore and service projects.
41.
Magagna
,
D.
and
Uihlein
,
A.
, “
Ocean energy development in Europe: Current status and future perspectives
,”
Int. J. Mar. Energy
11
,
84
104
(
2015
).
42.
Makridis
,
C.
, “
Offshore wind power resource availability and prospects: A global approach
,”
Environ. Sci. Policy
33
,
28
40
(
2013
).
44.
MEyC
, see http://www.investinspain.org/invest/wcm/idc/groups/public/documents/documento/mda0/mzi4/~edisp/4328718.pdf for “
Oportunidades en el sector español de la energía marina'. INVEST IN SPAIN Nota de oportunidad: 'Energía renovable: energía marin
,” Ministerio de Economía y Competitividad (MEyC).
45.
Neill
,
S. P.
,
Hashemi
,
M. R.
, and
Lewis
,
M. J.
, “
The role of tidal asymmetry in characterizing the tidal energy resource of Orkney
,”
Renewable Energy
68
,
337
350
(
2014
).
46.
O Rourke
,
F.
,
Boyle
,
F.
, and
Reynolds
,
A.
, “
Tidal energy update 2009
,”
Appl. Energy
87
,
398
409
(
2010a
).
47.
O Rourke
,
F.
,
Boyle
,
F.
, and
Reynolds
,
A.
, “
Marine current energy devices: Current status and possible future applications in Ireland
,”
Renewable Sustainable Energy Rev.
14
,
1026
1036
(
2010b
).
48.
Pelc
,
R.
and
Fujita
,
R. M.
, “
Renewable energy from the ocean
,”
Mar. Policy
26
,
471
479
(
2002
).
49.
Pérez-Collazo
,
C.
,
Greaves
,
D.
, and
Iglesias
,
G.
, “
A review of combined wave and offshore wind energy
,”
Renewable Sustainable Energy Rev.
42
,
141
153
(
2015
).
50.
Ramos
,
V.
,
Carballo
,
R.
,
Álvarez
,
M.
,
Sánchez
,
M.
, and
Iglesias
,
G.
, “
Assessment of the impacts of tidal stream energy through high-resolution numerical modeling
,”
Energy
61
,
541
554
(
2013
).
51.
Ramos
,
V.
,
Carballo
,
R.
,
Álvarez
,
M.
,
Sánchez
,
M.
, and
Iglesias
,
G.
, “
A port towards energy self-sufficiency using tidal stream power
,”
Energy
71
,
432
444
(
2014a
).
52.
Ramos
,
V.
,
Carballo
,
R.
,
Sanchez
,
M.
,
Veigas
,
M.
, and
Iglesias
,
G.
, “
Tidal stream energy impacts on estuarine circulation
,”
Energy Convers. Manage.
80
,
137
149
(
2014b
).
53.
Ramos
,
V.
and
Iglesias
,
G.
, “
Performance assessment of tidal stream turbines: A parametric approach
,”
Energy Convers. Manage.
69
,
49
57
(
2013
).
54.
55.
Renewable UK
, see http://www.renewableuk.com/en/publications/index.cfm/wave-and-tidal-energy-in-the-uk-2013 for “Wave and Tidal Energy in the UK Conquering Challenges, Generating Growth,”
2013
.
56.
Royal Decree (RD) 661/2007
, see www.boe.es/boe/dias/2007/05/26/pdfs/A22846-22886.pdf for information about regulation of renewables in Spain,
2007
.
57.
Royal Decree (RD) 1028/2007
, see www.cne.es/cd_navidad/CNE/03_hechos_destacables/download/1_normativa/RD1028-2007.pdf for information about the administrative procedure for processing applications for the authorisation of electricity generating facilities in Spanish waters,
2007
.
58.
Rusu
,
L.
and
Guedes Soares
,
C.
, “
Wave energy assessments in the Azores islands
,”
Renewable Energy
45
,
183
196
(
2012
).
59.
Sáenz de Miera
,
G.
,
del Río González
,
P.
, and
Vizcaíno
,
I.
, “
Analysing the impact of renewable electricity support schemes on power prices: The case of wind electricity in Spain
,”
Energy Policy
36
,
3345
3359
(
2008
).
60.
Sanchez
,
M.
,
Carballo
,
R.
,
Ramos
,
V.
, and
Iglesias
,
G.
, “
Energy production from tidal currents in an estuary: A comparative study of floating and bottom-fixed turbines
,”
Energy
77
,
802
811
(
2014a
).
61.
Sanchez
,
M.
,
Carballo
,
R.
,
Ramos
,
V.
, and
Iglesias
,
G.
, “
Floating vs. bottom-fixed turbines for tidal stream energy: A comparative impact assessment
,”
Energy
72
,
691
701
(
2014b
).
62.
Sanchez
,
M.
,
Carballo
,
R.
,
Ramos
,
V.
, and
Iglesias
,
G.
, “
Tidal stream energy impact on the transient and residual flow in an estuary: A 3D analysis
,”
Appl. Energy
116
,
167
177
(
2014c
).
63.
Simas
,
T.
,
O'Hagan
,
A. M.
,
O'Callaghan
,
J.
,
Hamawi
,
S.
,
Magagna
,
D.
,
Bailey
,
I.
, et al., “
Review of consenting processes for ocean energy in selected European Union Member States
,”
Int. J. Mar. Energy
9
,
41
59
(
2015
).
64.
Upham
,
P.
and
García Pérez
,
J.
, “
A cognitive mapping approach to understanding public objection to energy infrastructure: The case of wind power in Galicia, Spain
,”
Renewable Energy
83
,
587
596
(
2015
).
65.
Vazquez
,
A.
,
Astariz
,
S.
, and
Iglesias
,
G.
, “
A strategic policy framework for promoting the marine energy sector
,” in
3rd IAHR Europe Congress, Book of Proceedings
,
Porto, Portugal
(
2014
).
66.
Vazquez
,
A.
and
Iglesias
,
G.
, “
Device interactions in reducing the cost of tidal stream energy
,”
Energy Convers. Manage.
97
,
428
438
(
2015a
.).
67.
Vazquez
,
A.
and
Iglesias
,
G.
, “
Public perceptions and externalities in tidal stream energy: A valuation for policy making
,”
Ocean Coastal Manage.
105
,
15
24
(
2015b
).
68.
Veigas
,
M.
,
Carballo
,
R.
, and
Iglesias
,
G.
, “
Wave and offshore wind energy on an island
,”
Energy Sustainable Dev.
22
,
57
65
(
2014
).
69.
Veigas
,
M.
and
Iglesias
,
G.
, “
Wave and offshore wind potential for the island of Tenerife
,”
Energy Convers. Manage.
76
,
738
745
(
2013
).
70.
Veigas
,
M.
and
Iglesias
,
G.
, “
Potentials of a hybrid offshore farm for the island of Fuerteventura
,”
Energy Convers. Manage.
86
,
300
308
(
2014
).
71.
Veigas
,
M.
,
Lopez
,
M.
,
Romillo
,
P.
,
Carballo
,
R.
,
Castro
,
A.
, and
Iglesias
,
G.
, “
A proposed wave farm on the Galician coast
,”
Energy Convers. Manage.
99
,
102
111
(
2015
).
72.
Verbruggen
,
A.
,
Fischedick
,
M.
,
Moomaw
,
W.
,
Weir
,
T.
,
Nadaï
,
A.
,
Nilsson
,
L. J.
, et al., “
Renewable energy costs, potentials, barriers: Conceptual issues
,”
Energy Policy
38
,
850
861
(
2010
).
73.
Vicinanza
,
D.
,
Cappietti
,
L.
,
Ferrante
,
V.
, and
Contestabile
,
P.
, “
Estimation of the wave energy in the Italian offshore
,”
J. Coastal Res. SI
64
,
613
617
(
2011
); available at http://www.ics2011.pl/artic/SP64_613-617_D.Vicinanza.pdf.
74.
Vicinanza
,
D.
,
Contestabile
,
P.
, and
Ferrante
V.
, “
Wave energy potential in the north-west of Sardinia (Italy)
,”
Renewable Energy
50
,
506
521
(
2013
).
75.
Villate
,
J.
, “
Ocean energy activities in Spain and vision of the OES
,” In
International Conference on Ocean Energy
ICOE, Dublin (
2012
).
76.
WaveDragon Ltd.
, http://www.wavedragon.net/ for more information about the development of the Wave Dragon technology.
77.
Willis
,
M.
,
Masters
,
I.
,
Thomas
,
S.
,
Gallie
,
R.
,
Loman
,
J.
,
Cook
,
A.
, et al., “
Tidal turbine deployment in the Bristol Channel: A case study
,”
Proc. ICE-Energy
163
,
93
105
(
2010
).
You do not currently have access to this content.