For the first time in Indonesia, public opinion survey on nuclear energy was conducted from 2010 to 2016. The sample size of 3000-4000 respondents was spread across various provinces, with a margin of error of +/- 1.8% at a confidence level of 95.0%. The sampling technique used is a combination of multistage random sampling and simple random sampling. The survey results show that the level of public support nationally is above 70% in the last 3 years, despite the NIMBY phenomenon in Bangka-Belitung. The results also show that, the NPP promotion activity which is integrated between the Central and Regional Governments, is followed by several incentives for infrastructure development for the prospective NPP site which are expected to be able to minimize the NIMBY phenomenon. Nationally, high support for the NPP program, possibly due to the urgent need for stable and reliable electricity. TV media is the most effective tool for socialization, while economically, radio can be chosen as a promotional tool with wide reach nationally. The uniqueness of Indonesia is, the government is still very trusted by the public, so that the public expects an explanation from the Government on the benefits and risks of the nuclear power plant program. Promotions targeting women are expected to have a significant impact on the high level of public support for the NPP program.
Skip Nav Destination
,
,
,
Article navigation
10 December 2019
THE 3RD INTERNATIONAL CONFERENCE ON NUCLEAR ENERGY TECHNOLOGIES AND SCIENCES (ICoNETS) 2019
19 September 2019
Padang, Indonesia
Research Article|
December 10 2019
Public opinion survey on nuclear energy in Indonesia: Understanding public perception on nuclear power plant program Free
D. S. Wisnubroto;
D. S. Wisnubroto
a)
National Nuclear Energy Agency – BATAN
, Indonesia
a)Coresponding author: [email protected]
Search for other works by this author on:
Ruslan;
Ruslan
National Nuclear Energy Agency – BATAN
, Indonesia
Search for other works by this author on:
D. Irawan;
D. Irawan
National Nuclear Energy Agency – BATAN
, Indonesia
Search for other works by this author on:
T. Erni
T. Erni
National Nuclear Energy Agency – BATAN
, Indonesia
Search for other works by this author on:
D. S. Wisnubroto
1,a)
Ruslan
2
D. Irawan
3
T. Erni
4
National Nuclear Energy Agency – BATAN
, Indonesia
National Nuclear Energy Agency – BATAN
, Indonesia
National Nuclear Energy Agency – BATAN
, Indonesia
National Nuclear Energy Agency – BATAN
, Indonesia
a)Coresponding author: [email protected]
AIP Conf. Proc. 2180, 020042 (2019)
Citation
D. S. Wisnubroto, Ruslan, D. Irawan, T. Erni; Public opinion survey on nuclear energy in Indonesia: Understanding public perception on nuclear power plant program. AIP Conf. Proc. 10 December 2019; 2180 (1): 020042. https://doi.org/10.1063/1.5135551
Download citation file:
Citing articles via
The implementation of reflective assessment using Gibbs’ reflective cycle in assessing students’ writing skill
Lala Nurlatifah, Pupung Purnawarman, et al.
Classification data mining with Laplacian Smoothing on Naïve Bayes method
Ananda P. Noto, Dewi R. S. Saputro
Effect of coupling agent type on the self-cleaning and anti-reflective behaviour of advance nanocoating for PV panels application
Taha Tareq Mohammed, Hadia Kadhim Judran, et al.
Related Content
Repowering Bangka Belitung: The utilization of nuclear power plants to replace fossil energy sources for energy security and sustainability
AIP Conf. Proc. (March 2025)
Cost estimation of HVDC transmission system of Bangka’s NPP candidates
AIP Conf. Proc. (September 2014)
Survey of prospective locations for radionuclide monitoring stations in Indonesia; A preliminary site assessment
AIP Conf. Proc. (August 2022)
Spatial distribution of crime in Sumatra and java using unsupervised learning algorithm
AIP Conf. Proc. (April 2024)