In the construction of the RDNK there are three stages of activities namely pre-construction, construction, operation and maintenance. In the construction phase there is a preparatory work that provides employment opportunities for the community around the Puspiptek Serpong area. Preparation work is the stage of work that must be planned before the execution of the main work of a construction project. This study aims to obtain an overview of the economic potential that exists in the site preparation stage. Site preparation is carried out after the site permit and construction permit are obtained. The method used is a literature review on problems and analysis. The results of the study indicate that at the preparation stage of the RDNK site there are job opportunities in the informal sector, so that it can accommodate professional workers in the formal sector who were not initially accommodated. The employment opportunities include the provision of consumption, transportation, shelter and clean water supply, which if can be utilized proportionally will improve the welfare of the community. With employment opportunities, there is considerable economic potential for the RDNK site preparation stage

1.
Batan
, “
Final Report Feasibility Study Site Development Plan
”,
Preparation of Prelimenary Engineering Design Document for Experimental Power Reactor (RDE)
, December
2015
.
2.
Siti
Alimah
, et.al., “
Analisis Komparasi HTGR Tipe Prismatik Dan Pebble Bed
”,
Jurnal Pengembangan Energi Nuklir
, Vol.
16
, No.
1
, Juni
2014
.
3.
Batan
, “
General Design Features of The RDE
”,
Final Report Safety Analysis Report, The Document Preparation of Preliminary Engineering Design Of The Experimental Power Reactor
, Desember
2015
.
4.
Mudjiono
, et.al., “
Manajemen Konstruksi Reaktor Daya Eksperimental
”,
Prosiding Seminar Nasioanl Teknologi Energi Nuklir
2017
, Makasar, 12 Oktober 2017.
5.
Athanasius Kurniawan Prasetyo
, “
Persiapan Pelaksanaan Proyek
”, https://www.scribd.com/doc/200508419/Bab-II-Persiapan-Pelaksanaan-Proyek. Accessed April 2019.
6.
IAEA
, “
Construction for Nuclear Installastion
”,
IAEA Safety Standards
, No. SSG-38,
2015
.
7.
PP RI. No 54 tahun 2010 Tentang Pengadaan Barang/Jasa Pemerintah jo PP RI No 70 tahun 2012.
8.
IAEA
, “
Contruction Technologies for Nuclear Power Plants
”,
IAEA Nuclear Energy Series
, No. NP-T-2.5, Vienna, 2011.
9.
Athanasius Kurniawan
Prasetyo
, “
Efisiensi Tata Letak Fasilitas dan Sarana Proyek Alam Mendukung Metode Pekerjaan Konstruksi
”, http://eprints.undip.ac.id/33828/5/1624_chapter_I.pdf, Accessed May2019.
10.
Praboyo
,
B.
, “Keterlambatan Waktu Pelaksanaan Proyek; Klasifikasi dan Peringkat dari Penyebab- penyebabnya”,
Universitas Kristen Petra
,
Surabaya
,
1998
.
11.
Kementrian
PU
, “
Modul Pelatihan Masyarakat Program KOTAKU tahun 2017
”, http://kotaku.pu.go.id/view/6001/modul-pelatihan-masyarakat-program-kotaku-tahun-2017
12.
Ni Komang
Erawati
, “
Analisis Pola Pertumbuhan Ekonomi dan Sektor Potensial Kabupaten Klungkung
”,
Jurnal Ekonomi dan Bisnis
Volume
01
, No.
01
, Fakultas Ekonomi, Universitas Udayana, Bali,
2012
.
13.
Yolamalinda
, “
Analisis Potensi Ekonomi Daerah Dalam Pengembangan Komoditi Unggulan Kabupaten Agam
”,
Journal of Economic Education
Vol.
3
No.
1
,
2014
14.
Arsyad
,
Lincolin
, “Ekonomi Pembangunan”,
Edisi Kelima, UPP STIE YKPN
,
Yogyakarta
,
2010
.
15.
BPS Kabupaten Tangerang
, “Potensi Ekonomi Kabupaten Tangerang”
BPS
,
Sensus Ekonomi
,
2016
.
16.
R. Achmad
Widijanto
, “
Profil Demografi Kota Tangerang Selatan Untuk Mendukung Pembangunan
”,
Sarasehan Mendekatkan Teknologi Nuklir Kepada Masyarakat
, Puspiptek, 25 September 2018.
17.
BPS, “Tangerang Selatan Dalam angka 2017”, BPS
,
2017
.
18.
BAPPENAS
, “Peran Sektor Informal sebagai Katub Pengaman Masalah Ketenagakerjaan”,
Kajian Evaluasi Pembangunan Sektoral, Kedeputian Evaluasi Kinerja Pembangunan 2009
.
This content is only available via PDF.