The paper proposes equipment maintenance strategies using age reduction methods. The chosen maintenance strategy is the optimal preventive maintenance (PM) policy, which is expected to minimize total costs. In addition, the proposed strategy is expected to improve equipment performance as measured by the Overall Equipment Effectiveness (OEE). PM is done to reduce failure and avoid penalties as a result of failure. Meanwhile, Corrective Maintenance (CM) is carried out by the lessor (equipment owner) to correct the failure with minimal repairs in the lease period. In the present study, an efficient algorithm was developed to obtain an optimal PM policy and a closed form solution was obtained for case where the lifetime distribution of the equipment was Weibull. The total cost expected to use the optimal PM policy under the proposed maintenance scheme was then compared with the performance of other policies under various maintenance schemes through numerical examples.
Skip Nav Destination
Article navigation
26 June 2019
EXPLORING RESOURCES, PROCESS AND DESIGN FOR SUSTAINABLE URBAN DEVELOPMENT: Proceedings of the 5th International Conference on Engineering, Technology, and Industrial Application (ICETIA) 2018
12–13 December 2018
Surakarta, Indonesia
Research Article|
June 26 2019
Performance measurement on lease equipment with overall equipment effectiveness
Ade Supriatna;
Ade Supriatna
a)
1
Department of Industrial Engineering, Institut Teknologi Sepuluh Nopember
, Surabaya, Indonesia
2
Departement of Industrial Engineering, Universitas Darma Persada
, Jakarta, Indonesia
a)Corresponding author: ade_supriatna@ft.unsada.ac.id
Search for other works by this author on:
Moses Laksono Singgih;
Moses Laksono Singgih
1
Department of Industrial Engineering, Institut Teknologi Sepuluh Nopember
, Surabaya, Indonesia
Search for other works by this author on:
Erwin Widodo;
Erwin Widodo
1
Department of Industrial Engineering, Institut Teknologi Sepuluh Nopember
, Surabaya, Indonesia
Search for other works by this author on:
Nani Kurniati
Nani Kurniati
1
Department of Industrial Engineering, Institut Teknologi Sepuluh Nopember
, Surabaya, Indonesia
Search for other works by this author on:
a)Corresponding author: ade_supriatna@ft.unsada.ac.id
AIP Conf. Proc. 2114, 060011 (2019)
Citation
Ade Supriatna, Moses Laksono Singgih, Erwin Widodo, Nani Kurniati; Performance measurement on lease equipment with overall equipment effectiveness. AIP Conf. Proc. 26 June 2019; 2114 (1): 060011. https://doi.org/10.1063/1.5112482
Download citation file:
Citing articles via
Related Content
Dispersion and dipolar orientational effects on the linear electroabsorption and electro‐optic responses in a model guest/host nonlinear optical system
Journal of Applied Physics (December 1996)
New insights into anhydrobiosis using cellular dielectrophoresis-based characterization
Biomicrofluidics (November 2019)
Segregation of voiced and whispered concurrent vowels in English and Japanese
J Acoust Soc Am (April 1993)
Brain lateralization in 2‐, 3‐, and 4‐month olds for phonetic and musical timbre discriminations under memory load
J Acoust Soc Am (August 2005)
High speed lightweight encryption technique for IoT and embedded applications
AIP Conference Proceedings (April 2023)