The 44.19 MWp concentrator photovoltaic (CPV) power plant CPV 1 in Touwsrivier, South Africa is three years in operation. Lessons learnt for optimizing the power production are presented. The plant configuration is described and the key steps for reliable and efficient operation and maintenance are discussed. By introducing structured operation and maintenance procedures, the produced energy of the plant could be significantly increased. Without these new maintenance procedures the power plant output was less than originally predicted. Eventually, after introducing the proper maintenance concept in July 2017 for the first time, the total produced energy cumulated over a 12 month period was above the predicted modelled energy. This proves the importance to develop and apply site specific structured operation and maintenance procedures.
Skip Nav Destination
,
,
,
Article navigation
13 September 2018
14TH INTERNATIONAL CONFERENCE ON CONCENTRATOR PHOTOVOLTAIC SYSTEMS (CPV-14)
16–18 April 2018
Puertollano, Spain
Research Article|
September 13 2018
Operation & maintenance – The key for reliable performance in a CPV power plant Free
Johannes Wüllner;
Johannes Wüllner
a)
1
Fraunhofer Institute for Solar Energy Systems ISE
, Heidenhofstr.2, 79110 Freiburg, Germany
a)Corresponding author: [email protected]
Search for other works by this author on:
Marc Steiner;
Marc Steiner
1
Fraunhofer Institute for Solar Energy Systems ISE
, Heidenhofstr.2, 79110 Freiburg, Germany
Search for other works by this author on:
Maike Wiesenfarth;
Maike Wiesenfarth
1
Fraunhofer Institute for Solar Energy Systems ISE
, Heidenhofstr.2, 79110 Freiburg, Germany
Search for other works by this author on:
Andreas W. Bett
Andreas W. Bett
1
Fraunhofer Institute for Solar Energy Systems ISE
, Heidenhofstr.2, 79110 Freiburg, Germany
Search for other works by this author on:
Johannes Wüllner
1,a)
Marc Steiner
1
Maike Wiesenfarth
1
Andreas W. Bett
1
1
Fraunhofer Institute for Solar Energy Systems ISE
, Heidenhofstr.2, 79110 Freiburg, Germany
a)Corresponding author: [email protected]
AIP Conf. Proc. 2012, 020011 (2018)
Citation
Johannes Wüllner, Marc Steiner, Maike Wiesenfarth, Andreas W. Bett; Operation & maintenance – The key for reliable performance in a CPV power plant. AIP Conf. Proc. 13 September 2018; 2012 (1): 020011. https://doi.org/10.1063/1.5053499
Download citation file:
Citing articles via
The implementation of reflective assessment using Gibbs’ reflective cycle in assessing students’ writing skill
Lala Nurlatifah, Pupung Purnawarman, et al.
Effect of coupling agent type on the self-cleaning and anti-reflective behaviour of advance nanocoating for PV panels application
Taha Tareq Mohammed, Hadia Kadhim Judran, et al.
Design of a 100 MW solar power plant on wetland in Bangladesh
Apu Kowsar, Sumon Chandra Debnath, et al.
Related Content
Large-scale and long-term CPV power plant field results
AIP Conf. Proc. (September 2015)
From 0.01 to 44 MWp with Concentrix technology
AIP Conf. Proc. (September 2016)
Validation of the PVSyst Performance Model for the Concentrix CPV Technology
AIP Conf. Proc. (December 2011)
Techno-economic analysis of natural gas-fired microgrid for electricity, fresh water, and cold storage in rural area
AIP Conf. Proc. (March 2019)
Short Term Electricity Storage For CPV Power Plants
AIP Conf. Proc. (December 2011)