Raygen Resources has recently completed a Central Receiver CPV (CSPV) pilot plant in Central Victoria, Australia. The system is under final commissioning and initial operation is expected in late April 2015. The pilot demonstrates a full scale CSPV repeatable unit in a form that is representative of a commercial product and provides a test bed to prove out performance and reliability of the CSPV technology. Extensive testing of the system key components: dense array module, wireless solar powered heliostat and control system has been performed in the laboratory and on sun. Results from this key component testing are presented herein.
REFERENCES
1.
S.P.
Phillips
et al, “Up to date levelised costs of electricity of photovoltaics”, Fraunhofer Institute for Solar energy Systems
, Sep 2014
.2.
J.E.
Haysom
et al, “Learning curve analysis of concentrated photovoltaic systems”, Progress in Photovoltaics: Research and Applications
, Wiley
, 2013
.3.
R.M.
Swanson
, “Photovoltaic Central Receiver Systems”, Solar Engineering, The American Society of Mechanical Engineers
, 1992
, pp. 1067
–1070
4.
Martin A.
Green
et al, “40% efficient sunlight to electricity conversion”, Progress in Photovoltaics: Research and Applications
, Mar 2015
5.
J.B.
Lasich
et al, “Comparative Performance Assessment for Central Receiver CPV Systems
”, CPV-7
, 2011
This content is only available via PDF.
© 2015 AIP Publishing LLC.
2015
AIP Publishing LLC