The HRIBF Tandem Accelerator Radiation Safety System was designed to permit experimenters and operations staff controlled access to beam transport and experiment areas with accelerated beam present. Neutron-Gamma detectors are mounted in each area at points of maximum dose rate and the resulting signals are integrated by redundant circuitry; beam is stopped if dose rate or integrated dose exceeds established limits. This paper will describe the system, in use for several years at the HRIBF, and discuss changes recently made to modernize the system and to make the system compliant with DOE Order 5480.25 and related ORNL updated safety rules.