Typical parameters of B factory colliders are presented, along with their justification. Design challenges that arise from these parameter choices are indicated. These challenges appear in both the physics design of the collider and its technological implementation. An overview of the three active B factory projects (PEP‐II, KEK‐B, and the CESR upgrade) is briefly given, and technical approaches adopted by the projects to deal with the design challenges are outlined. Project status and plans for the various B factory projects are also indicated. Because the problems faced by the designers of B factories are closely related to those that will be faced in the design of a Tau‐Charm Factory (τcF), the solutions adopted by the B factory designers can in many cases be carried over to the τcF essentially unchanged.
Skip Nav Destination
Article navigation
5 January 1996
The workshop on the tau/charm factory
21-23 Jun 1995
Argonne, Illinois (USA)
Research Article|
January 05 1996
B factory collider designs and future plans Available to Purchase
Michael S. Zisman
Michael S. Zisman
Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory Berkeley, California 94720
Search for other works by this author on:
Michael S. Zisman
Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory Berkeley, California 94720
AIP Conf. Proc. 349, 172–195 (1996)
Citation
Michael S. Zisman; B factory collider designs and future plans. AIP Conf. Proc. 5 January 1996; 349 (1): 172–195. https://doi.org/10.1063/1.49253
Download citation file:
Pay-Per-View Access
$40.00
Sign In
You could not be signed in. Please check your credentials and make sure you have an active account and try again.
5
Views
Citing articles via
The implementation of reflective assessment using Gibbs’ reflective cycle in assessing students’ writing skill
Lala Nurlatifah, Pupung Purnawarman, et al.
Effect of coupling agent type on the self-cleaning and anti-reflective behaviour of advance nanocoating for PV panels application
Taha Tareq Mohammed, Hadia Kadhim Judran, et al.
Design of a 100 MW solar power plant on wetland in Bangladesh
Apu Kowsar, Sumon Chandra Debnath, et al.
Related Content
Novel flavor factories & the UCLA φ factory project
AIP Conf. Proc. (July 1992)
Super B Factories
AIP Conf. Proc. (November 2006)
B factory technical challenges
AIP Conf. Proc. (February 1992)
Super B Factory at KEK
AIP Conf. Proc. (November 2008)
Monochromatic design for the Apiary B‐factory
AIP Conf. Proc. (October 1990)