Concrete construction works at the Slovakian Nuclear Power Plant Mochovce (NPP EMO) began almost 35 years ago (1988). The NPP concrete structure working life depends on correct design assumption, concrete works execution, working load conditions and the influence of the surrounding environment. In our contribution, we evaluated the available information on the concrete construction works and testing of concrete structures, available indicators of the environment and the influence of the operating load on the supporting concrete structures near the reactor shaft. We have shown that the used classes of concrete in the given conditions of load and influence of the environment, according to valid standards, correspond to the requirements for building structures with a working life of 100 years.
Skip Nav Destination
Article navigation
18 January 2024
APPLIED PHYSICS OF CONDENSED MATTER (APCOM2023)
21–23 June 2023
Štrbské Pleso, Slovak Republic
Research Article|
January 18 2024
Working life assessment of internal load-bearing concrete structures of nuclear power plant
Robert Hinca;
Robert Hinca
a)
1
Faculty of Electrical Engineering and Information Technology, STU in Bratislava
, Ilkovicova 3, 812 19 Bratislava, Slovak Republic
a)Corresponding author: robert.hinca@stuba.sk
Search for other works by this author on:
Vladimir Slugen;
Vladimir Slugen
b)
1
Faculty of Electrical Engineering and Information Technology, STU in Bratislava
, Ilkovicova 3, 812 19 Bratislava, Slovak Republic
Search for other works by this author on:
Julius Dekan;
Julius Dekan
c)
1
Faculty of Electrical Engineering and Information Technology, STU in Bratislava
, Ilkovicova 3, 812 19 Bratislava, Slovak Republic
Search for other works by this author on:
Branislav Stribrnsky
Branislav Stribrnsky
d)
1
Faculty of Electrical Engineering and Information Technology, STU in Bratislava
, Ilkovicova 3, 812 19 Bratislava, Slovak Republic
Search for other works by this author on:
a)Corresponding author: robert.hinca@stuba.sk
AIP Conf. Proc. 3054, 050002 (2024)
Citation
Robert Hinca, Vladimir Slugen, Julius Dekan, Branislav Stribrnsky; Working life assessment of internal load-bearing concrete structures of nuclear power plant. AIP Conf. Proc. 18 January 2024; 3054 (1): 050002. https://doi.org/10.1063/5.0187409
Download citation file:
Sign in
Don't already have an account? Register
Sign In
You could not be signed in. Please check your credentials and make sure you have an active account and try again.
Pay-Per-View Access
$40.00
32
Views
Citing articles via
The effect of a balanced diet on improving the quality of life in malignant neoplasms
Yu. N. Melikova, A. S. Kuryndina, et al.
Animal intrusion detection system using Mask RCNN
C. Vijayakumaran, Dakshata, et al.
Recognition of cat ras of face and body using convolutional neural networks
Akhmad Wahyu Aji, Esmeralda Contessa Djamal, et al.
Related Content
Seismic safety issue for operation and lifetime extension of nuclear facilities in Slovakia
AIP Conf. Proc. (October 2024)
Modeling and optimization of radioactive wastewater monitor
AIP Conf. Proc. (January 2024)
Structural changes of Fecralloy induced by neutron irradiation observed by Mössbauer spectrometry
AIP Conf. Proc. (January 2024)
Analysis of the effect of layered subsoil on the seismic excitation of the NPP hall building
AIP Conference Proceedings (November 2020)
Critical analysis of the primary circuit components important to LTO’s safe operation of NPP VVER 440 and VVER 1000
AIP Conf. Proc. (October 2024)