PT Vale Indonesia Tbk. planned to increase nickel matte production in 2019. One of the attempts was to replace a haul truck from CAT 777D to CAT 785C. The replacement required a mine haul road widening activity. Mine haul road widening activities at PTVI used heavy types of equipment which were excavator, dump truck, and bulldozer rented from the contractor. Therefore, it needed scheduling in order to optimize the rental costs of heavy equipment. The aim of this research was to calculate the time duration of project completion and to optimize the rental cost of mine haul road widening activity in Sorowako Block. The method used for scheduling the widening activity was the critical path method (CPM) and the method used to obtain optimal cost was the simplex method. Based on CPM analysis, the mine haul road widening activity is scheduled to finish in 693 days and become 232 days after being optimized which are 109 working days of excavator Komatsu PC200, 77 working days of dump truck Hino 500 FM 260 Ti, and 46 working days of bulldozers Komatsu D65p with an optimal cost is $342,689.
Skip Nav Destination
,
,
Article navigation
19 May 2025
THE 5TH EPI INTERNATIONAL CONFERENCE ON SCIENCE AND ENGINEERING (EICSE) 2021
28–29 September 2021
Gowa, Indonesia
Research Article|
May 19 2025
Optimization rental cost of heavy equipment in mine Haul road widening activity PT Vale Indonesia Tbk. Available to Purchase
Amelia Yustin;
Amelia Yustin
a)
1
Department of Mining Engineering, Engineering Faculty, Hasanuddin University
, Gowa, Indonesia
a)Corresponding author: [email protected]
Search for other works by this author on:
Aryanti Virtanti Anas;
Aryanti Virtanti Anas
b)
1
Department of Mining Engineering, Engineering Faculty, Hasanuddin University
, Gowa, Indonesia
b)Corresponding author: [email protected]
Search for other works by this author on:
Rizki Amalia
Rizki Amalia
c)
1
Department of Mining Engineering, Engineering Faculty, Hasanuddin University
, Gowa, Indonesia
Search for other works by this author on:
Amelia Yustin
1,a)
Aryanti Virtanti Anas
1,b)
Rizki Amalia
1,c)
1
Department of Mining Engineering, Engineering Faculty, Hasanuddin University
, Gowa, Indonesia
a)Corresponding author: [email protected]
b)Corresponding author: [email protected]
AIP Conf. Proc. 3032, 110006 (2025)
Citation
Amelia Yustin, Aryanti Virtanti Anas, Rizki Amalia; Optimization rental cost of heavy equipment in mine Haul road widening activity PT Vale Indonesia Tbk.. AIP Conf. Proc. 19 May 2025; 3032 (1): 110006. https://doi.org/10.1063/5.0266573
Download citation file:
Pay-Per-View Access
$40.00
Sign In
You could not be signed in. Please check your credentials and make sure you have an active account and try again.
8
Views
Citing articles via
Effect of coupling agent type on the self-cleaning and anti-reflective behaviour of advance nanocoating for PV panels application
Taha Tareq Mohammed, Hadia Kadhim Judran, et al.
Design of a 100 MW solar power plant on wetland in Bangladesh
Apu Kowsar, Sumon Chandra Debnath, et al.
With synthetic data towards part recognition generalized beyond the training instances
Paul Koch, Marian Schlüter, et al.
Related Content
Estimation of requirement excavator and haul-truck equipment based on region vs baseline model in PT. Vale Indonesia Tbk
AIP Conf. Proc. (November 2021)
Mine haul road planning in South West Mahalona area Pt vale Indonesia Tbk
AIP Conf. Proc. (November 2022)
Heavy construction equipment noise study using dosimetry and time‐motion studies
J. Acoust. Soc. Am. (September 2005)
Sounds and vibrations in the frozen Beaufort Sea during gravel island construction
J. Acoust. Soc. Am. (February 2008)
On the mutual influence of average speed, trip time and hauling distance of quarry haul trucks
AIP Conf. Proc. (November 2022)