Foundation work is a lowest portion of building structure which is a most important activity in the construction project. This work is a critical activity as consequently. Whenever the foundation work delayed, it has a major impact on the overall of the project life cycle. This case study was studied in one of the construction projects in Indonesia which it found the high frequent delays in supplying of pile foundations. To overcome this problem, the purposes of this study need to analyse the supply chain strategy in the procurement of pile foundations. Supply Chain Operations Reference (SCOR) model that developed by the Supply Chain Council (SCC) was used to analysis supply chain strategy in developing a project in order to increase customer satisfaction. Moreover, several variables were adopted involving Source, Make, Deliver, Return, and customer satisfaction. This study used Multiple Linear Regression which is determine the relationship of between the independent variables and dependent variable. Finding showed that all the independent variables for the level of customer satisfaction had an effect of 99.7% for the first supplier and 93.6% for the second supplier. Based on multiple linier regression equation, second supplier got highest significant effect on the dependent variable. Implication of the study showed that the second supplier better than the first supplier. Indeed, this finding able to be implemented for policy maker in order to select suppliers. Further study is suggested to develop scheduling of this project in order to evaluate the supplier performance.

1.
S. N.
Anwar
, “
Manajemen Rantai Pasokan (Supply Chain Management): Konsep Dan Hakikat
,”
Jurnal Dinamika Informatika
, vol.
3
, no.
2
,
2011
, doi: .
2.
M. N.
Sholeh
,
Manajemen Rantai Pasok Konstruksi
,
Pertama. Yogyakarta
:
Pustaka Pranala
,
2020
.
3.
R.
Vrijhoef
and
L.
Koskela
, “
The four roles of supply chain management in construction
,”
European Journal of Purchasing and Supply Management
, vol.
6
, no.
3–4
, pp.
169
178
,
2000
, doi: .
4.
S. N.
Tucker
,
S.
Mohamed
,
D. R.
Johnston
,
S. L.
Mcfallan
, and
K. D.
Hampson
, “
Building And Construction Industries Supply Chain Project (Domestic) for Department of Industry, Science and Resources
,”
2001
.
5.
M.-H.
/
Irwin
,
J. R.
Stock
, and
D. M.
Lambert
, “
Strategic Logistics Management Fourth Edition
,”
2001
.
6.
V.
Misra
and
M. I.
Khan
, “
Supply Chain Management Systems: Architecture, Design and Vision
,”
Journal of Strategic Innovation and Sustainability
, vol.
6
, no.
4
, pp.
102
108
,
2010
, [Online]. Available: www.sap.com
7.
D.
Irfan
,
X.
Xiaofei
, and
D. Sheng
Chun
, “
A SCOR Reference Model of the Supply Chain Management System in an Enterprise
,”
2008
.
8.
K. Bte
Ismail
,
E.
Supriyanto
, and
N.
Yanti
, “
Supply Chain Configuration Using Hybrid SCOR Model and Discrete Event Simulation
,”
2014
. Accessed: Sep. 30, 2022. [Online]. Available: https://www.researchgate.net/publication/287470460
9.
W. Y. C.
Wang
,
H. K.
Chan
, and
D. J.
Pauleen
, “
Aligning business process reengineering in implementing global supply chain systems by the SCOR model
,”
Int J Prod Res
, vol.
48
, no.
19
, pp.
5647
5669
, Oct.
2010
, doi: .
10.
Supply Chain
Council
.,
SCOR® supply chain operations reference model
.
The Supply Chain Council, Inc
,
2008
.
11.
N.
Handayani
and
Y.
Nadya
, “
Identification of Risk Event of Mushroom Supply Chain in Langsa City By SCOR Method
,”
2019
.
12.
S.
Kale
and
D.
Arditi
, “
General contractors’ relationships with subcontractors
,”
Construction management and Economics
, vol.
9
, no.
5
, pp.
541
549
,
2001
, Accessed: Sep. 30, 2022. [Online]. Available: https://www.tandfonline.com/doi/abs/10.1080/01446193.2001.9709630
13.
R. D.
Broft
and
L.
Koskela
, “
Supply chain management in construction from a production theory perspective
,” in
IGLC 2018 - Proceedings of the 26th Annual Conference of the International Group for Lean Construction: Evolving Lean Construction Towards Mature Production Management Across Cultures and Frontiers
,
2018
, vol.
1
, pp.
271
281
. doi: .
14.
Ma. Dolores C.
Tongco
, “Purposive Sampling as a Tool for Informant Selection,”
Ethnobotany Research & Applications
, vol.
5
, pp.
147
158
,
2007
.
This content is only available via PDF.