Geothermal is a potential renewable energy source to be developed in Indonesia. Indonesia’s geothermal energy potential reaches 25,386.5 MW, but only 1,948.5 MW is used for electricity generation. One of the biggest obstacles to geothermal development for power generation is geothermal electricity tariffs and the absence of regulatory reform or the establishment of attractive incentives to further ensure the economics of geothermal power projects, This paper tries to look at the economics of the latest geothermal electricity tariffs set by the government, Calculation of the economic value of geothermal electricity rates using excel software using secondary data, It is necessary to adjust the tariff for geothermal electricity from 11.74 US$ cents/kWh to around 0.198 cents US$/kWh so that the price of geothermal electricity is in the range of 11.938 cents. IRR value that is smaller than the Discount Rate value of 10.36% indicates a high risk of loss to inflation or changes in the value of currency or goods, The benefits of this research for the world of education can be a reference for the geothermal economy in Indonesia, while in the industrial world it can be a reference for tariffs set by the government to see if the project is feasible to run.
Skip Nav Destination
Article navigation
8 May 2023
3RD BOROBUDUR INTERNATIONAL SYMPOSIUM ON SCIENCE AND TECHNOLOGY 2021
15 December 2021
Magelang, Indonesia
Research Article|
May 08 2023
Economic analysis of 1x55 MW capacity geothermal field development
Alfrets Lumi;
Alfrets Lumi
a)
1
Faculty of Engineering, Atma Jaya Catholic University of Indonesia
, Jakarta, Indonesia
Search for other works by this author on:
Havidh Pramadika;
Havidh Pramadika
b)
2
Petroleum Engineering, Universitas Trisakti
, Jakarta, Indonesia
b)Corresponding author: havidh@trisakti.ac.id
Search for other works by this author on:
Isdaryanto Iskanda;
Isdaryanto Iskanda
c)
1
Faculty of Engineering, Atma Jaya Catholic University of Indonesia
, Jakarta, Indonesia
Search for other works by this author on:
AIP Conf. Proc. 2706, 020146 (2023)
Citation
Alfrets Lumi, Havidh Pramadika, Isdaryanto Iskanda, Reinaldi; Economic analysis of 1x55 MW capacity geothermal field development. AIP Conf. Proc. 8 May 2023; 2706 (1): 020146. https://doi.org/10.1063/5.0120319
Download citation file:
Sign in
Don't already have an account? Register
Sign In
You could not be signed in. Please check your credentials and make sure you have an active account and try again.
Pay-Per-View Access
$40.00
13
Views
Citing articles via
Social mediated crisis communication model: A solution for social media crisis?
S. N. A. Hamid, N. Ahmad, et al.
The effect of a balanced diet on improving the quality of life in malignant neoplasms
Yu. N. Melikova, A. S. Kuryndina, et al.
Design of a 100 MW solar power plant on wetland in Bangladesh
Apu Kowsar, Sumon Chandra Debnath, et al.