Completion of projects on time becomes a top priority while taking into account the required technical factors. One of the obstacles in the BulakKapal underpass project Bekasi is the soil condition at the project site, which has high compressibility properties such as soft clay. One method to overcome large settlements and accelerate settlement times is to use Pre-Fabricated Vertical Drain (PVD). Thisstudyaimstocomparethedecreaseinsoilconsolidationwithout PVD and by using PVD and knowing excess pore pressure for each variation. Variations used in this study are landfill time, which is 4weeksand8weeksofthe gradual embankment,andthedistanceofPVDis1.2m,1.6m,and2m. These variations are modeled in Plaxis to determine the decrease in consolidation, thevalue ofporepressure, and the acceleration time of consolidation. From the modeling results on Plaxis, it can be seen that the installation distance of PVD significantly influences the time required for the consolidation process. Consolidation settlement using PVD can accelerate the settlement time up to 3.04 times faster than settlement without PVD.

1.
Afriana
J
,
Permanasari
A
,
Fitriani
A.
Project based learning integrated to stem to enhance elementary school’s students scientific literacy
.
Jurnal Pendidikan IPA Indonesia.
2016
;
5
(
2
):
261
7
.
2.
K. S. Satindra
AP
.
Analysis of Consolidated Deterioration of Preloading Method With and Without PVD On The Balikpapan-Samarinda Toll Road Segment Five STA 20+ 375.
2018
;
3.
R. D. Maghviroh
HF
.
Analysis of Subgrade Improvement and Embankment Stability Reinforcement Using Preloading and PVD
.
2020
;
4.
Panjaitan
SRN
.
Analisa Preloading Dengan Prefabricated Vertical Drain (PVD) Terhadap Perbaikan Tanah Lunak Pada Pembangunan Jalan Tol Tebing Tinggi-Indrapura. JCEBT (JOURNAL OF CIVIL ENGINEERING, BUILDING AND TRANSPORTATION)
.
2020
;
4
(
2
):
85
93
.
5.
Zhafirah
A
,
Permana
S
,
Daris
M
,
Yogawsara
D.
Comparative analysis of soft soil consolidation time due to improvement using Prefabricated Vertical Drain
. In:
IOP Conference Series: Materials Science and Engineering.
IOP Publishing
;
2021
. p.
22056
.
6.
Bo
MW
,
Arulrajah
A
,
Horpibulsuk
S
,
Leong
M.
Quality management of prefabricated vertical drain materials in mega land reclamation projects: A case study
.
Soils and foundations.
2015
;
55
(
4
):
895
905
.
7.
Indraratna
B
,
Perera
D
,
Rujikiatkamjorn
C
,
Kelly
R.
Soil disturbance analysis due to vertical drain installation
.
Proceedings of the Institution of Civil Engineers-Geotechnical Engineering.
2015
;
168
(
3
):
236
46
.
8.
Prasetio
A
,
Prihatiningsih
A.
Analisis Penggunaan Prefabricated Vertical Drains (PVD) pada Tanah Lempung Lunak yang Terdapat Lapisan Lensa.
JMTS
:
Jurnal Mitra Teknik Sipil
.
2020
;
3
(
1
):
119
34
.
9.
Kuswanda
W.
Improvement of Soft Clay Preloading Method on Transportation Infrastructure Development on Kalimantan Island
.
2016
;
188
.
10.
Cai
Y
,
Xie
Z
,
Wang
J
,
Wang
P
,
Geng
X.
New approach of vacuum preloading with booster prefabricated vertical drains (PVDs) to improve deep marine clay strata
.
Canadian Geotechnical Journal.
2018
;
55
(
10
):
1359
71
.
11.
Sutarman
.
E.
Effect of Vertical Drained Geotextile and Sand Column on Consolidation Time
.
2019
;
This content is only available via PDF.
You do not currently have access to this content.