PT VIS is a company engaged in the automotive industry of electrically powered vehicles. Currently, PT VIS is developing an electric motorcycle product to add to its existing product line. In developing new products, some risks and obstacles cannot be avoided. Therefore, a risk assessment and mitigation actions must be carried out, which can be done using the House of Risk method. Based on the data collection, 17 risk events are relevant to the company. From the data processing that has been done, two risk agents with the most significant Aggregate Risk Potential values were identified, namely the battery with a limited lifetime and poor cooperation between teams. Based on this, preventive actions were modeled to prevent risks. The selected mitigation actions are stock calculation following the demand forecasting carried out, proper battery storage SOPs, more supervision from the head of the department on the team’s performance in the production process, more communicative use of language from the head of the department to the staff, market research more profound into the market trends and target, as well as appropriate calculation in demand forecasting within the market research carried out.

1.
A.
Chaudhuri
,
H.
Boer
,
Journal of Engineering and Technology Management
, (
2016
)
2.
J. M.
Zabala-Iturriagagoitia
,
Journal of Technology Management & Innovation
,
7
(
1
) (
2012
)
3.
C. W.
Lamb
,
J. F
.,
Hair
,
C.
McDaniel
,
Marketing
(
11
ed.), (
Mason South-Western Cengage
,
2011
)
4.
D. S.
Dewi
,
B.
Syaifrudin
,
E.
Nikmah
,
Risk management in new product development process for fashion industry: Case study hijab industry
, (
2015
)
5.
N. E.
Wahyudin
,
I.
Santoso
,
The Asian Journal of Technology Management
,
9
(
2
),
98
108
(
2016
)
6.
N.
Bhuiyan
,
Journal of Industrial Engineering and Management
,
4
(
4
),
746
770
(
2011
)
7.
H.
Umar
, Metode riset bisnis: Panduan mahasiswa untuk melaksanakan riset dilengkapi contoh proposal dan hasil riset bidang manajemen dan akuntansi (
2
ed.), (
PT Gramedia Pustaka Utama Jakarta
,
2003
)
8.
I.
Fahmi
,
Manajemen risiko
, (
Alfabeta Bandung
,
2010
)
9.
A.
Salim
,
Asuransi dan manajemen risiko
, (
Raja Grafindo Persada Jakarta
,
2007
)
10.
H.
Darmawi
,
Manajemen risiko, (pnBumi Aksara Jakarta
,
2008
)
11.
H.
Kerzner
,
Project management : A systems approach to planning, scheduling, and controlling
, (
John Wiley &
Sons New York
,
1995
)
12.
H.
Darmawi
,
Manajemen perbankan
, (
Bumi Aksara Jakarta
,
2014
)
13.
N.
Pujawan
,
L.
Geraldin
,
House of risk: A model for proactive supply chain risk management
,
Business Process Management Journal
,
15
(
6
),
953
967
(
2009
)
14.
M.
Hikmat
,
Metode penelitian
, (
Graha Ilmu Yogyakarta
,
2011
)
15.
Bogdan
,
Taylor
,
Metodologi penelitian kualitatif
, (
Remadja Karya Bandung
,
1975
)
This content is only available via PDF.
You do not currently have access to this content.