The purpose of this research is to identify waste in the production process of making one of the products in the XYZ garment company. Waste in this study refers to the lean manufacturing method. The methods used in this study are VSM (Value Stream Mapping), WAM (Waste Assessment Model), QFM (Quality Filter Mapping), and FMEA (Failure Mode Effect Analysis) method. The results of this study are the highest types of waste that affect other wastage is a defect. After checking all the production processes, the sewing process is a process that causes a lot of mistakes where the highest cause is the thread is cut off when the sewing takes place. For that, we need further research to solve it.

1.
T.
Ohno
and
N.
Bodek
, Toyota production system: beyond large-scale production (
Productivity press
,
New York
,
2019
).
2.
J. P.
Womack
and
D. T.
Jones
,
Journal of the Operational Research Society
48
,
1148
1148
(
1997
).
3.
A. P.
Lacerda
,
A. R.
Xambre
, and
H. M.
Alvelos
,
Int. J. Prod. Res.
54
,
1708
1720
(
2016
).
4.
E.
Amrina
and
A. A. A.
Lubis
, “
Minimizing waste using lean manufacturing: A case in cement production
,” In
2017 4th International Conference on Industrial Engineering and Applications (ICIEA)
(
IEEE
,
2017
), pp.
71
75
.
5.
S. M.
Zahraee
,
Int. J. L
7
,
136
148
(
2016
).
6.
V.
Chahal
and
M. S.
Narwal
,
Int. J. Theor. Appl. Mech.
12
,
275
286
(
2017
).
7.
A.
Fercoq
,
S.
Lamouri
, and
V.
Carbone
,
J. Clean. Prod.
137
,
567
578
(
2016
).
8.
S.
Nallusamy
,
Int. J. Eng. Res. Africa
21
,
231
237
(
2016
).
9.
D. T.
Matt
and
E.
Rauch
,
Procedia CIRP
12
,
420
425
(
2013
).
10.
S. K.
Dewi
, “
Analisis Defect Pada Proses Produksi Dengan
,”
in Seminar Nasional Teknologi dan Rekayasa
(
2018
), pp.
100
105
.
11.
I.
Siregar
,
A. A.
Nasution
,
U.
Andayani
,
R. M.
Sari
,
K.
Syahputri
, and Anizar
IOP Conference Series: Materials Science and Engineering
308
,
012004
(
2018
).
12.
K.
Arbelinda
and
R.
Rumita
,
Industrial Engineering Online Journal
6
,
1
10
(
2017
).
13.
N. H.
Zakaria
,
N. M. Z. N.
Mohamed
,
M. F. F. A.
Rahid
, and
A. N. M.
Rose
,
MATEC Web of Conferences
90
,
01048
(
2016
).
14.
E. U.
Margareta
,
e-Proceeding of Engineering
5
,
2829
2836
(
2018
).
15.
D. M.
Utama
,
S. K.
Dewi
, and
V. I.
Mawarti
,
J. Ilm. Tek. Ind.
15
,
36
46
(
2016
).
16.
Suharjo
and
S.
Sudiro
,
J. Ilm. TEKNOBIZ
8
,
51
68
(
2018
).
17.
H.
Henny
and
H. R.
Budiman
,
IOP Conf. Ser. Mater. Sci. Eng.
407
,
012077
(
2018
).
18.
W.
Adrianto
and
M.
Kholil
,
J. Optimasi Sist. Ind.
14
,
299
(
2016
).
19.
T.
Ristyowati
,
A.
Muhsin
, and
P. P.
Nurani
,
Opsi
10
,
85
(
2017
).
20.
I. A.
Rawabdeh
,
Int. J. Oper. Prod. Manag.
25
,
800
822
(
2005
).
21.
T.
Ohno
,
Japanese Econ. Stud.
10
,
83
101
(
1982
).
This content is only available via PDF.
You do not currently have access to this content.