Construction projects contribute to economy growth significantly in any country. However, these projects are faced by delays frequently, especially for Highway Sector. The construction industry is one of the main sectors that provide supreme additives for the development of an economy. However, numerous projects exploit extensive delays and there by exceed initial time and cost estimates. Construction delay is considered to be one of the most reoccur problems in the construction industry and it has an unfavorable effect on project success in terms of cost, time, quality, and safety. Highway and Expressway projects in India are affected by cosmic delays. Delays occur in every construction projects, and the importance of these delays differs widely from one project to another. During construction, the delay means exceeding the completion date mentioned in the contract or exceeding the date on which the parties concur to the dispatch of the project. During the last ten years, as a result of fundamental change in the volume and capacity of the highway construction zone, it is very important to detailed analysis about factors of delays and to build up a brief understanding amidst the highway and expressway professionals. Adopting a comprehensive project stakeholders’ analysis namely client, consultant and contractor, the research identified the important factors affecting the delays in Indian highway and expressway construction industry and then establishing the association between factors to develop the prediction models to appraise the impact of these delay factors. Most critical variables causing construction delay were analyzed using factor analysis. These results will significantly contribute in managing the time overwhelm in Indian highway & expressway construction industry. This project delays forms a challenge for developing nations like India, where exponential costs result from difficulty in recognizing and mitigating the project detain factors. Project delays are directly related to the total construction costs. The delays can only be minimized if the cause is identified. Project delays incorporate several reasons such as missing funds, changes in the drawings, lack of effective communication and deficient project management. This topic focuses on prominent factors causing delays in highway & expressway construction sector, and accordingly proposes a suggestive framework to design a construction project in an efficient manner and assisting mitigating of delays.

1.
Prakash
Rao
and
Joseph Camron
Culas
,
International Journal of Current Research
6
(
06
),
7219
7222
(
2014
).
2.
Ghulam Abbas
Niazai
and KassimGidado,
Journal of Construction Engineering & Management
45
49
(
2014
).
3.
Vidhya
,
K.
, &
Kandasamy
,
S.
International Journal of Coal Preparation and Utilization
36
(
6
),
318
325
(
2016
).
4.
Sudharsan
,
N
, &
Saravanaganesh
,
S.
International Journal of Innovative Technology and Exploring Engineering
8
(
8
),
1644
1647
(
2019
).
5.
Apolot
,
R.
,
Alinaitwe
,
H. M.
and Tindiwensi,
Advances in Engineering and Technology, Contribution of Scientific Research in Development
305
311
(
2011
).
6.
Anu V.
Thomas
,
J.
Sudhakumar
Journal of Construction in Developing Countries
19
(
1
),
53
68
(
2014
).
7.
N.
Sudharsan
,
T.
Palanisamy
,
S. C.
Yaragal
,
Ecology, Environment and Conservation
24
,
S331
S338
(
2018
).
8.
Nitin
Chaphalkar
and
KC
Iyer
Australasian Journal of Construction Economics and Building
(
1
),
32
-
41
(
2014
).
9.
Ibrahim
Mahamid
, AmundBruland and
Nabil
Dmaidi
,
Journal of Management in Engineering
28
,
300
310
(
2012
).
10.
Soo-Yong
Kim
,
Kiet Nguyen
Tuan
and
Van Truong
Luu
,
KSCE Journal of Civil Engineering
20
,
519
529
(
2016
).
11.
JesperKranker
Larsen
,
Geoffrey
QipingShen
,
Soren Munch
Lindhard
and
Thomas Ditlev
Bronoe
Journal of Management in Engineering
32
, (
2016
).
12.
Sudharsan
,
N.
, &
Grant
,
B. C. J.
International Journal of Civil Engineering and Technology
9
(
8
),
700
704
(
2018
).
13.
Ragavendran
U
,
Viral
Mehta
,
Vishal
Fegade
,
M.
Ramachandran
,
International Journal of Civil Engineering and Technology
,
8
(
11
),
536
545
(
2017
).
14.
Vidhya
,
K.
, &
Kandasamy
,
S.
Pollution Research
32
(
2
),
405
409
(
2013
).
15.
Sadi A.
Assaf
,
Sadiq
Al-Hejji
,
International Journal of Project Management
24
,
349
357
(
2006
).
16.
Sudharsan
,
N.
, & Palanisamy,
T.
Ecology
,
Environment and Conservation
24
,
S339
S343
(
2018
).
17.
Sambasivan
,
M
and
Soon
,
Y. W.
2007
.
International Journal of Project Management
25
(
5
),
517
525
(
2007
).
18.
Vidhya
,
K.
, &
Kandasamy
,
S.
Journal of Structural Engineering (India)
41
(
4
),
410
419
(
2014
).
19.
Sudharsan
,
N
, &
Sivalingam
,
K.
International Journal of Recent Technology and Engineering
8
(
3
),
3435
3438
(
2019
)
This content is only available via PDF.
You do not currently have access to this content.