PT Vale Indonesia Tbk. is a company engaged in the nickel mining industry that uses a surface mining system with an open cast method. The effects of the surface mining system, there is an expansion of the mining area, so that the excavation, loading, and hauling activities experience a decrease ineffectiveness. The purpose of this study is to estimate the need for digging-loading equipment and haul-truck equipment. The method used in this study is to analyze the factors that affect the need for mechanical devices, such as cycle time, distance, the density of materials, and availability of tools, productivity. The calculation of mining equipment requirements uses two models. Based on the distribution one block into several mining fronts by region and calculated in total in one block without the division of baseline to achieve the production target of 82,611,762 tons/year of material. The results of calculations by the model by region produce more number of tools compared to the baseline model, namely one unit difference for Excavator Hitachi ZX 870 BH, Shovel Hitachi EX 1900 FS and Loader CAT 992 Class, while three units difference for Dump Truck CAT 777D.

[1]
Hidayat
,
W.
,
Rustiadi
,
E.
, &
Kartodihardjo
,
H.
(
2015
).
Dampak Pertambangan Terhadap Perubahan Penggunaan Lahan dan Kesesuaian Peruntukan Ruang (Studi kasus Kabupaten Luwu Timur, Provinsi Sulawesi Selatan
).
Jurnal Perencanaan Wilayah dan Kota
,
26
(
2
),
130
.
[2]
Isgianda
,
F.
,
Sumarya
,
S.
, &
Prabowo
,
H.
(
2018
).
Evaluasi Biaya Dan Kebutuhan Alat Angkut Dan Alat Muat Pengupasan Lapisan Tanah Penutup (Overburden) Pit B PT. Bina Bara Sejahtera Kecamatan Ulok Kupai, Kabupaten Bengkulu Utara, Provinsi Bengkulu
.
Bina Tambang
,
3
(
3
),
1255
1261
.
[3]
Natalia
,
P.
,
Triantoro
,
A.
,
Saismana
,
U.
,
dan
Rahman
,L.A.
2017
. “
Evaluasi Sinkronisasi Alat Gali Muat PC 400 dan Alat Angkut Hino FM 260 Dalam Pencapaian Target Penambangan Batubara
”.
Jurnal HIMASAPTA, Vol
2
No.
2
,
41
44
[4]
Putra
,
J. J.
, &
Gusman
,
M.
(
2020
).
Optimalisasi Produksi Alat Gali Muat dengan Metode Overall Equipment Effectiveness (OEE) pada KegiatanOre Getting di PT. Bhakti Karya Mandiri Jobsite KM. 17, Kecamatan Toba, Kabupaten Sanggau–Kalimantan Barat
.
Bina Tambang
,
5
(
2
),
228
237
.
[5]
Rahayu
,
S.
, &
Murad
,
M.
(
2020
).
Perencanaan Kebutuhan Alat Gali-Muat dan Alat Angkut Batukapur di Area Pit Limit pada Tambang Quarry PT. Semen Padang, Sumatera Barat
.
Bina Tambang
,
5
(
1
),
212
224
.
[6]
Rifki
,
I.
, &
Anaperta
,
Y. M.
(
2018
).
Evaluasi Produksi Alat Gali Muat dan Alat Angkut sebagai Upaya Pencapaian Target Produksi Clay Area 242 PT. Semen Padang
.
Bina Tambang
,
3
(
3
).
[7]
Rochmanhadi
. Kapasitas dan Produksi Alat-Alat Berat.
Jakarta
:
Departemen Pekerjaan Umum
. (
1992
)
[8]
Saliman
,
H.
,
Aryanto
,
R.
, &
Letlora
,
L. F.
(
2020
).
Kebutuhan Alat Gali Muat dan Alat Angkut untuk Mencapai Target Produksi pada Tambang Grasberg, PT Freeport Indonesia
.
Indonesian Mining and Energy Journal
,
2
(
1
),
24
30
.
This content is only available via PDF.
You do not currently have access to this content.