AST-04 well is a production well located in Riau, this well currently has two production Layers (SD_04 has oil reserve and SD_05 has gas reserve). Using commingle completion the oil production in this well is below expectation. This problem caused by SD_05 gas production with high pressure which through SD_04 perforation hamper the oil flow. Re-completion design using multiple completion become a solution to improve oil production. Oil from SD_04 will be flowed using short string, while gas from SD_05 using long string. By Vogel Equation, the redesign results production increase to 290 BOPD with natural flow using tubing size 2 7/8 inch. To utilize SD_05 gas production and increase SD_04 oil production, natural gas lift selected to assist oil lifting. Gas produces from SD_05 will be injected to short string (SD_04 perforation area) through an orifice. This method expected can increase oil production SD_04 layer to 406 BOPD with injection rate 1.367 MMSCFD. Using Craft, Holdden, & Graves equation, the orifice size 16/64 needed to flow the gas with injection rate desired.

1.
W.
Renpu
, Advance Well Completion Engineering Thrid Edition,
USA
:
Gulf Professional Publishing
,
2008
.
2.
T. R.
Allen
, Production Operation Well Completion, Workover and Stimulation Vol 1,
Tulsa
:
Oil and Gas Consultant International Inc
,
1982
.
3.
K. E.
Brown
,
The Technology Of Artificial Lift Method
Vol.
1
,
Tulsa, Oklahoma
:
Pen Well Book
,
1977
.
4.
A. P. I. E. a. P. Department
,
Exploration and Production Department American Institute, English : API Gas Lift Manual
,
1994
.
5.
K. E.
Brown
, The Technology Of Artificial Lift Method Vol.
2a
,
Tulsa, Oklahoma
:
Pen Well Book
,
1980
.
This content is only available via PDF.
You do not currently have access to this content.