AST-04 well is a production well located in Riau, this well currently has two production Layers (SD_04 has oil reserve and SD_05 has gas reserve). Using commingle completion the oil production in this well is below expectation. This problem caused by SD_05 gas production with high pressure which through SD_04 perforation hamper the oil flow. Re-completion design using multiple completion become a solution to improve oil production. Oil from SD_04 will be flowed using short string, while gas from SD_05 using long string. By Vogel Equation, the redesign results production increase to 290 BOPD with natural flow using tubing size 2 7/8 inch. To utilize SD_05 gas production and increase SD_04 oil production, natural gas lift selected to assist oil lifting. Gas produces from SD_05 will be injected to short string (SD_04 perforation area) through an orifice. This method expected can increase oil production SD_04 layer to 406 BOPD with injection rate 1.367 MMSCFD. Using Craft, Holdden, & Graves equation, the orifice size 16/64 needed to flow the gas with injection rate desired.
Skip Nav Destination
Article navigation
8 July 2020
2ND INTERNATIONAL CONFERENCE ON EARTH SCIENCE, MINERAL, AND ENERGY
3 October 2019
Yogyakarta, Indonesia
Research Article|
July 08 2020
Natural gas lift design as lifting operation at AST-04 well multilayer using multiple completion
Mia Ferian Helmy;
Mia Ferian Helmy
a)
Departement of Petroleum Engineering, Universitas Pembangunan Nasional Veteran Yogyakarta
, Indonesia
Search for other works by this author on:
Edgie Yuda Kaesti;
Edgie Yuda Kaesti
b)
Departement of Petroleum Engineering, Universitas Pembangunan Nasional Veteran Yogyakarta
, Indonesia
Search for other works by this author on:
Andres Septia
Andres Septia
c)
Departement of Petroleum Engineering, Universitas Pembangunan Nasional Veteran Yogyakarta
, Indonesia
Search for other works by this author on:
AIP Conf. Proc. 2245, 090007 (2020)
Citation
Mia Ferian Helmy, Edgie Yuda Kaesti, Andres Septia; Natural gas lift design as lifting operation at AST-04 well multilayer using multiple completion. AIP Conf. Proc. 8 July 2020; 2245 (1): 090007. https://doi.org/10.1063/5.0007096
Download citation file:
Sign in
Don't already have an account? Register
Sign In
You could not be signed in. Please check your credentials and make sure you have an active account and try again.
Sign in via your Institution
Sign in via your InstitutionPay-Per-View Access
$40.00
23
Views