One of the parameters of the electrical power operating system stability is the need to balance the supply provided by the plant generation and its load requirement. The underway operation in PetroChina international jabung from time to time makes the need for operational loads tend to change. Replacement or additional load in the future also harmonized with the operational load configuration and the need for additional generation supply. A transient analysis is needed to determine the limits of system stability in dealing with various kinds of interference including the ability of the system to overcome generator tripping disturbances, short circuit, and motor starting disturbances. The analysis is used to provide the best recommendation for whether the system needs additional supply or the best scheme for load shedding. Analysis of the interference is seen from the frequency response, rotor angle response and voltage response in the system. A transient analysis is needed to determine the limits of system stability in dealing with various kinds of interference. including the ability of the system to overcome generator tripping disturbances, short circuit, and motor starting disturbances. The analysis is used to provide the best recommendation for whether the system needs additional supply or the best scheme for load shedding. Analysis of the interference is seen from the frequency response, rotor angle response and voltage response in the system.

1.
V.
Aprillia
,
D.
Despa
,
H.
Gusmedi
, and
L.
Hakim
,
Jurnal Teknik Elektro UNILA
3
,
1
8
(
2015
)
2.
P.
Kundur
, Power System and Stability Control (
California
,
McGraw-Hill Education
,
1994
.)
3.
M. A.
Ullah
,
A.
Qaiser
,
Q.
Saeed
,
R. A.
Abbasi
,
I.
Ahmed
, and
A. Q.
Soomro
,
IEEE Journal
1
.
1
6
,
2017
.
4.
P.
Kundur
,
J.
Paserba
,
V.
Ajjarapu
,
G.
Andersson
,
A.
Bose
,
C.
Canizares
,
N.
Hatziargyriou
,
D.
Hill
,
A.
Stankovic
,
C.
Taylor
,
T. V.
Custem
and
V.
Vittal
,
IEEE journal
19
,
1
15
(
2004
)
5.
A.
Asrasri
and
B.
Ramos
,
Texas Power and Energy Conference (TPEC)
1
,
1
7
, (
2018
)
6.
J.
Grainger
and
W. D.
Stevenson
, in
Power System Analysis
, (
New York
,
McGaw-Hill Book.co
,
1994
)
7.
F.
Ariansyah
,
A.
Priyadi
, and
M.
Pujiantara
,
ITS Journal
15
,
1
9
(
2016
).
8.
P. P.
Rezky
,
O.
Penangsang
, and
N. K.
Aryani
,
ITS Journal
5
,
1
5
(
2016
)
9.
Defariza
,
A.
Supriyanto
, and
V. L. B.
Putri
,
ITS Journal
1
,
1
12
2015
.
10.
Y.
Estiningsih
,
Farikhin
, and
N. P.
Puspita
,
UNDIP Journal
3
,
1
8
(
2015
)
11.
N.
Amin
, in
Jurnal Teknik Elektro UNTAD
9
,
1
11
(
2011
)
12.
H.
Saadat
, in
Power System Analysis
, (
New York
,
McGraw-Hill Education
,
1999
)
This content is only available via PDF.
You do not currently have access to this content.