One of the most imperative safety instruments in any boiler (combustion) is flame scanner system. Flame scanner is used to find the flame monitoring and to give flame on/off status of burner to control system. Flame Scanner output is one of the valuable feedbacks to boiler automatic control system and also used to maintain the boiler steadiness and safety.Flame scanner system should be worked in accordance to NFPA 8502 (National Fire Protection Association) guidelines for gas, oil and pulverized coal systems. Most of the time flame scanner contacts are bypassed (or looped) by user, because scanner did not show the proper value of flame. Due to improper mixing of oil and atomizing agent in oil gun, mismatch ratio between flame and air flow, poor maintenance of oil gun (choke), inappropriate location of flame scanner detector head in burner or windbox and mismatch set point adjustment in amplifier unit of flame scanner. The fundamental idea of this paper is to give the reasonable thought of erection, commission, maintenance, operation and set point adjustment of flame scanner system for thermal power plant.
Skip Nav Destination
Article navigation
20 March 2019
2ND INTERNATIONAL CONFERENCE ON INVENTIVE RESEARCH IN MATERIAL SCIENCE AND TECHNOLOGY : ICIRMCT 2019
30–31 January 2019
Coimbatore, India
Research Article|
March 20 2019
Empiricism in conception, erection, commissioning and ideologyof flame scanner system in thermal power plant
S. Gopinath;
S. Gopinath
a)
1
Ph.D Research Scholar, Department of E&I, Bharathiar University
, Coimbatore, Tamil Nadu, India
Search for other works by this author on:
Azha. Periyasamy;
Azha. Periyasamy
b)
2
Assistant Professor, Department of E&I, Bharathiar University
, Coimbatore, Tamil Nadu, India
Search for other works by this author on:
T. Karuppiah;
T. Karuppiah
3
Ph.D Research Scholar, Department of E&I, Bharathiar University
, Coimbatore, Tamil Nadu, India
Search for other works by this author on:
V. Anandaraj;
V. Anandaraj
4
Ph.D Research Scholar, Department of E&I, Bharathiar University
, Coimbatore, Tamil Nadu, India
Search for other works by this author on:
P. Santhosh;
P. Santhosh
5
Electrical Engineer
, Trichy, India
Search for other works by this author on:
Samsudeen J. R.;
E. Murugan
E. Murugan
d)
6
Dept.of ECS, Hindusthan College of Arts & Science
, Coimbatore, India
Search for other works by this author on:
AIP Conf. Proc. 2087, 020005 (2019)
Citation
S. Gopinath, Azha. Periyasamy, T. Karuppiah, V. Anandaraj, P. Santhosh, Samsudeen J. R., E. Murugan; Empiricism in conception, erection, commissioning and ideologyof flame scanner system in thermal power plant. AIP Conf. Proc. 20 March 2019; 2087 (1): 020005. https://doi.org/10.1063/1.5095221
Download citation file:
Sign in
Don't already have an account? Register
Sign In
You could not be signed in. Please check your credentials and make sure you have an active account and try again.
Sign in via your Institution
Sign in via your InstitutionPay-Per-View Access
$40.00
Citing articles via
Related Content
Conception of furnace safeguard supervisory system (FSSS) for thermal power plant
AIP Conference Proceedings (March 2019)
Seismic behaviour of steel industrial buildings built in the late 80’s in the Campania region of Italy
AIP Conf. Proc. (September 2023)
Illegally erected buildings in the Russian Federation: Relevance, reasons, consequences
AIP Conference Proceedings (August 2022)
Attenuation of noise by diffraction at a barrier edge
J Acoust Soc Am (May 1981)
Engineering and erection of a 300kW high-flux solar simulator
AIP Conference Proceedings (June 2017)