Post disaster reconstruction is complex, dynamic and chaotic in nature and as such represents many challenges because it is unlike normal construction. However, the time scale of reconstruction is shorter than the normal construction, but it often deals with uncertainties and the scale of the construction activities required is relatively high. After a disaster impacts a country, many governments, institutions and aid organizations cooperate and involved with the reconstruction process. This is seen as a tool for applying policies and programs designed to remedy the weakness in developmental policies, infrastructure and institutional arrangements. This paper reports a part of an on-going research on post-disaster housing reconstruction in Malaysia. An extensive literature review and pilot interviews were undertaken to establish the factors that contribute to the delay in post-disaster reconstruction project. Accordingly, this paper takes the perspective of recovery from non-government organization (NGO) and local authorities which act as providers of social services, builders of infrastructure, regulators of economic activity and managers of the natural environment. As a result, it is important on how those decisions are made, who is involved in the decision-making, and what are the consequences of this decision.

1.
J.
Le Masurier
,
S.
Wilkinson
, and
Y.
Shestakova
, “
An analysis of the alliancing procurement method for reconstruction following an earthquake
,”
Proc. 8th US Natl. Conf. Earthq. Eng.
, no.
290
, pp.
18
22
, (
2006
)
2.
D.
Ismail
,
T. A.
Majid
,
R.
Roosli
, and
N. A.
Samah
, “
Project Management Success for Post-disaster Reconstruction Projects: International NGOs Perspectives
,”
Procedia Econ. Financ.
, vol.
18
, no.
September
, pp.
120
127
, (
2014
)
3.
B.
Norling
, “
Effective Time Management in Post-Disaster Reconstruction
,”
Aust. New Zeal. Disaster Emerg. Manag. Conf.
, pp.
1
10
, (
2013
)
4.
Steinfort
,
P.
&
Walker
,
D.H.T.T.
, “
Critical success factors in project management globally and how they may be applied to aid projects
”, In
Proceedings of the PMOZ Achieving Excellence - 4th Annual Project Management Australia Conference
,
Brisbane, Australia
,
28-31 August 2007
. pp.
28
31
, (
2007
)
5.
United Nations Department of Humanitarian Affairs
, “
Internationally agreed glossary of basic terms related to disaster management
,”
United Nations
, no.
December
1992, p.
81
, (
1992
)
6.
N.
Siriwardena
and
R.
Haigh
, “
Stakeholder Consultation in the Preconstruction Process
” in
Post-Disaster Reconstruction of the Built Environment: Rebuilding for Resilience
, first edition,
D.
Amaratunga
and
R.
Haigh
,
Blackwell Publishing Ltd. Published
, (
2011
), pp.
117
132
.
7.
G.
Karunasena
and
R.
Rameezdeen
, “
Post-Disaster Housing Reconstruction Comporative study of donor vs owner-driven approaches
,”
Int. J. Disaster Resil. Built Environ.
, vol. Vol.
1
, no. Iss
2
, pp. pp.
173
191
, (
2010
)
8.
S.
Barakat
, “
Housing reconstruction after conflict and disaster
,” vol.
44
, no.
43
, (
2003
)
9.
A. A.
Bilau
,
E.
Witt
, and
I.
Lill
, “
A Framework for Managing Post-disaster Housing Reconstruction
,”
Procedia Econ. Financ.
, vol.
21
, no.
15
, pp.
313
320
, (
2015
)
10.
A.
Thomas
, “
Why logistics?
,”
Forced Migr. Rev.
, vol.
18
, no.
1
, p.
4
, (
2003
)
This content is only available via PDF.
You do not currently have access to this content.