One of the most significant parameters of cost calculations of a construction project are the costs. Their calculation on each stage of the investment process is characterized by high uncertainty. This is one of the reasons for using fuzzy logic to such calculations. The paper presents a short description of applications of fuzzy logic to compute costs on various stages of the investment process. They encompass both the initial planning stage and the calculations during the tender procedure.

1.
M.
Ammar
,
T.
Zayed
,
O.
Moselhi
,
Fuzzy-based life-cycle cost model for decision making under subjectivity
.
Journal of Construction Engineering and Management
,
139
,
5
,
2012
, pp.
556
563
.
2.
B.
Gladysz
,
D.
Kuchta
,
D.
Skorupka
,
Fuzzy Analysis of Project Duration in Situations of Risk
,
The International Conference Of Numerical Analysis And Applied Mathematics 2014 (ICNAAM-2014
),
Rhodes, Greece
,
22–28 September 2014
,
AIP Conference Proceedings
, Vol.
1648
,
2015
, Article Number: UNSP 600003.
3.
N.
Ibadov
,
J.
Kulejewski
,
M.
Krzemiński
,
Fuzzy ordering of the factors affecting the implementation of construction projects in Poland
,
11th International Conference Of Numerical Analysis And Applied Mathematics 2013: ICNAAM 2013
,
Rhodes, Greece
,
21–27 September 2013
,
AIP Conference Proceedings
, Vol.
1558
,
2013
, pp.
1298
1301
.
4.
N.
Ibadov
,
J.
Kulejewski
,
Evaluation of the project timeliness with fuzzy constraints
,
The International Conference Of Numerical Analysis And Applied Mathematics 2014 (ICNAAM-2014
),
22–28 September 2014
, Location:
Rhodes, Greece
,
AIP Conference Proceedings
, Vol.
1648
,
2015
, Article Number: UNSP 600002.
5.
M.
Juszczyk
,
The use of artificial neural networks for residential buildings conceptual cost estimation
,
11th International Conference Of Numerical Analysis And Applied Mathematics 2013: ICNAAM 2013
,
Rhodes, Greece
,
21–27 September 2013
,
AIP Conference Proceedings
, Vol.
1558
,
2013
, pp.
1302
1306
.
6.
M.
Juszczyk
,
Application of Committees of Neural Networks for Conceptual Cost Estimation of Residential Buildings
,
The International Conference Of Numerical Analysis And Applied Mathematics 2014 (ICNAAM-2014
),
Rhodes, Greece
,
22–28 September 2014
,
AIP Conference Proceedings
, Vol.
1648
,
2015
, Article Number: UNSP 600008.
7.
D.
Kuchta
,
D.
Skorupka
,
Choice of Countermeasures in Project Risk Management Using Fuzzy Modelling
,
International Journal Of Computers Communications & Control
, Vol.
9
(
5
),
2014
, pp.
584
592
.
8.
A.
Leśniak
,
The application of artificial neural networks in indirect cost estimation
,
11th International Conference Of Numerical Analysis And Applied Mathematics 2013: ICNAAM 2013
,
Rhodes, Greece
,
21–27 September 2013
,
AIP Conference Proceedings
, Vol.
1558
,
2013
, pp.
1312
1315
.
9.
A.
Leśniak
,
E.
Plebankiewicz
,
Modeling the Decision-Making Process Concerning Participation in Construction Bidding
,
Journal of Management in Engineering
, Vol.
31
(
2
),
2015
, article number 04014032.
10.
E.
Plebankiewicz
,
Modelling Decision-Making Processes In Bidding Procedures With The Use Of The Fuzzy Sets Theory
,
International Journal Of Strategic Property Management
, Vol.
18
(
3
),
2014
, pp.
307
316
.
11.
K.
Zima
,
The Use of Fuzzy Case-Based Reasoning in Estimating Costs in the Early Phase of the Construction Project
,
The International Conference Of Numerical Analysis And Applied Mathematics 2014 (ICNAAM-2014
),
Rhodes, Greece
,
22–28 September 2014
,
AIP Conference Proceedings
, Vol.
1648
,
2015
, Article Number: UNSP 600010.
This content is only available via PDF.
You do not currently have access to this content.