This article presents an example of estimating costs in the early phase of the project using fuzzy case-based reasoning. The fragment of database containing descriptions and unit cost of sports facilities was shown. The formulas used in Case Based Reasoning method were presented, too. The article presents similarity measurement using a few formulas, including fuzzy similarity. The outcome of cost calculations based on CBR method was presented as a fuzzy number of unit cost of construction work.

1.
S.
An
,
G.-H.
Kim
,
K.-I.
Kang
, “
A case-based reasoning cost estimating model using experience by analytic hierarchy process
”.
Building and Environment
,
42
(
7
),
2007
, pp.
2573
2579
.
2.
S.-J.
Chen
,
S.-M.
Chen
, “
Fuzzy Risk Analysis Based on Similarity Measures of Generalized Fuzzy Numbers
”,
IEEE Transactions on Fuzzy Systems
,
11
(
1
),
2003
, pp.
45
56
.
3.
M.
Gajzler
, “
Text and data mining techniques in aspect of knowledge acquisition for decision support system in construction industry
”,
Technological and Economic Development of Economy
,
16
(
2
),
2010
, pp.
219
232
.
4.
G.
Ginda
,
R.
Kozik
,
M.
Maślak
, “Application of Fuzzy Expert Opinions to Intensity Evaluation and Direction Identification of Cause – Effect Relations between Factors Organized by Influence Network”,
AIP Conference Proceedings
,
American Institute of Physics
, vol.
1648
,
2015
,
600007
.
5.
N.
Ibadov
,
J.
Kulejewski
and
M.
Krzemiński
, “Fuzzy ordering of the factors affecting the implementation of construction projects in Poland”,
AIP Conference Proceedings
,
American Institute of Physics
, vol.
1558
,
2013
, pp.
1298
1301
.
6.
N.
Ibadov
, „Wielokryterialny wybór wariantów wykonania przedsięwzięć budowlanych na podstawie rozmytej relacji preferencji”,
Logistyka: czasopismo dla profesjonalistów
,
Instytut Logistyki i Magazynowania
, nr
6
,
2014
, pp.
4564
4569
, CD 3.
7.
S.-H.
Ji
,
M.
Park
,
H.-S.
Lee
, “
Cost estimation model for building projects using case-based reasoning
”,
Canadian Journal of Civil Engineering
,
38
(
5
),
2011
, pp.
570
581
.
8.
M.
Juszczyk
, “The use of artificial neural networks for residential buildings conceptual cost estimation”,
AIP Conference Proceedings
,
American Institute of Physics
, vol.
1558
,
2013
, pp.
1302
1306
.
9.
M.
Juszczyk
, “Application of committees of neural networks for conceptual cost estimation of residential buildings”,
AIP Conference Proceedings
,
American Institute of Physics
, vol.
1648
,
2015
,
600008
.
10.
A.
Leśniak
, “The application of artificial neural networks in indirect cost estimation”,
AIP Conference Proceedings
,
American Institute of Physics
vol.
1558
,
2013
, pp.
1312
1315
.
11.
E.
Plebankiewicz
,
A.
Leśniak
, “
Overhead costs and profit calculation by polish contractors
”,
Technological and Economic Development ff Economy
,
19
(
1
),
2013
, pp.
141
161
.
12.
A.
Tazikova
,
M.
Kozlovska
, “
Achievment economic and environmental efficiency of construction using the parallel calculating costs
”,
Geoconference on Ecology, Economics, Education and Legislation, SGEM 2013
, Vol.
II
Book Series: International Multidisciplinary Scientific GeoConference-SGEM
,
2013
, pp.
11
18
.
13.
W.
Traczyk
,
Inżynieria wiedzy
,
Akademicka Oficyna Wydawnicza EXIT
,
Warszawa
,
2010
.
14.
K.
Zima
, “
The use of fuzzy case-based reasoning in estimating costs in the early phase of the construction project
”,
AIP Conference Proceedings
,
American Institute of Physics
, vol.
1648
,
2015
,
600010
.
This content is only available via PDF.
You do not currently have access to this content.