This article presents the concept of a method for estimating costs in the early phase of the project using fuzzy case-based reasoning. The procedure of case-based reasoning is described briefly. The possibility of using fuzzy sets in enhancing the ability of the CBR method is discussed. Also, an outline of the modified procedure for case-based reasoning using fuzzy sets is described.

1.
P.
Duverlie
and
J. M.
Castelain
,
Cost estimation during design step, parametric method versus case based reasoning method
,
International Journal of Manufacturing Technology
15
,
1999
, pp.
895
906
.
2.
N.
Ibadov
,
J.
Kulejewski
and
M.
Krzemiński
, “
Fuzzy ordering of the factors affecting the implementation of construction projects in Poland
” in:
AIP Conference Proceedings
,
American Institute of Physics
, vol.
1558
,
2013
, pp.
1298
1301
.
3.
A.
Idri
and
Abran
A.
,
A fuzzy logic based measures for software project similarity: validation and possible improvements
.
METRICS’01: Proceedings of the IEEE 7th International Symposium on Software Metrics
.
England, UK
,
2001
, pp
85
96
.
4.
A.
Idri
,
A.
Abran
and
T. M.
Khoshgoftaar
, “
Fuzzy Case-Based Reasoning Models for Software Cost Estimation
” in:
Soft Computing in Software Engineering. Studies in Fuzziness and Soft Computing
Volume
159
,
2004
, pp
64
96
.
5.
M.
Juszczyk
, “
The use of artificial neural networks for residential buildings conceptual cost estimation.
” In:
11th International Conference Of Numerical Analysis And Applied Mathematics 2013: ICNAAM 2013
.
AIP Publishing
,
2013
, Vol.
1558
, No.
1
, pp.
1302
1306
.
6.
G.-H
Kim
.,
S.-H.
An
and
K.-I
Kang
,
Comparison of construction cost estimating models based on regression analysis, neural networks, and case-based reasoning
.
Building and Environment
,
39
(
10
),
2004
, pp.
1235
1242
;
7.
A.
Leśniak
, A., “
The application of artificial neural networks in indirect cost estimation.
” in
11th International Conference Of Numerical Analysis And Applied Mathematics 2013: ICNAAM 2013
.
AIP Publishing
,
2013
, Vol.
1558
, No.
1
, pp.
1312
1315
.
8.
E.
Plebankiewicz
and
A.
Leśniak
. “
Overhead costs and profit calculation by Polish contractors
”.
Technological and Economic Development of Economy
19
.
1
(
2013
), pp.
141
161
.
This content is only available via PDF.
You do not currently have access to this content.