The accuracy of the two‐stage PVSyst model for the Concentrix CPV Technology is determined by comparing modeled to measured values. For both stages, i) the module model and ii) the power plant model, the underlying approaches are explained and methods for obtaining the model parameters are presented. The performance of both models is quantified using 19 months of outdoor measurements for the module model and 9 months of measurements at four different sites for the power plant model. Results are presented by giving statistical quantities for the model accuracy.